(BE: staging)

How to Get to Critical Path Construction in Miami by Bus or Train?

Directions to Critical Path Construction (Miami) with public transportation

The following transit lines have routes that pass near Critical Path Construction

  • BusBus: 37, 40, 42, MIACOCO, CGABGA.
  • TrainTrain: GREEN, ORANGE.

How to get to Critical Path Construction by bus?

Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.

How to get to Critical Path Construction by train?

Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.

Bus stops near Critical Path Construction in Miami

  • Sw 37 Av & Oak Av, 1 min walk,
  • Sw 37 Av & Percival Av, 1 min walk,
  • Sw 37 Av & Florida Av, 2 min walk,
  • Us 1 & Sw 37 Av N/n, 5 min walk,
  • Douglas Rd Station @ 3100 Sw 37 Av, 7 min walk,

Train station near Critical Path Construction in Miami

  • Coconut Grove, 34 min walk,

Bus lines to Critical Path Construction in Miami

  • MIACOCO, City Of Miami - Coconut Grove Route,
  • CGABGA, City Of Coral Gables Grand Avenue,
  • 37, 37 - South Miami Station,
  • 136, 136 - Douglas Road Station,
  • 400, 400 - Downtown Miami,
  • 40, 40 - Douglas Road Station,
  • 42, 42 - Douglas Rd Station,
  • CGABLE, Coral Gables Trolley,
Questions & Answers
  • What are the closest stations to Critical Path Construction?

    The closest stations to Critical Path Construction are:

    • Sw 37 Av & Oak Av stop is 35 yards away, 1 min walk.
    • Sw 37 Av & Percival Av stop is 35 yards away, 1 min walk.
    • Sw 37 Av & Florida Av stop is 142 yards away, 2 min walk.
    • Us 1 & Sw 37 Av N/n stop is 370 yards away, 5 min walk.
    • Douglas Rd Station @ 3100 Sw 37 Av is 506 yards away, 7 min walk.
    • Coconut Grove station is 2934 yards away, 34 min walk.
  • Which bus lines stop near Critical Path Construction?

    These bus lines stop near Critical Path Construction: 37, 40, 42, MIACOCO.

  • Which train lines stop near Critical Path Construction?

    These train lines stop near Critical Path Construction: GREEN, ORANGE.

  • What’s the nearest bus station to Critical Path Construction in Miami?

    The nearest bus stations to Critical Path Construction in Miami are Sw 37 Av & Oak Av and Sw 37 Av & Percival Av. The closest one is a 1 min walk away.

  • What time is the first train to Critical Path Construction in Miami?

    The GREEN is the first train that goes to Critical Path Construction in Miami. It stops nearby at 5:04 AM.

  • What time is the last train to Critical Path Construction in Miami?

    The GREEN is the last train that goes to Critical Path Construction in Miami. It stops nearby at 1:00 AM.

  • What time is the first bus to Critical Path Construction in Miami?

    The 400 is the first bus that goes to Critical Path Construction in Miami. It stops nearby at 3:48 AM.

  • What time is the last bus to Critical Path Construction in Miami?

    The 400 is the last bus that goes to Critical Path Construction in Miami. It stops nearby at 2:39 AM.

See Critical Path Construction, Miami, on the map

Public Transit to Critical Path Construction in Miami

Wondering how to get to Critical Path Construction in Miami? Moovit helps you find the best way to get to Critical Path Construction with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Critical Path Construction in real time.

Looking for the nearest stop or station to Critical Path Construction? Check out this list of stops closest to your destination: Sw 37 Av & Oak Av; Sw 37 Av & Percival Av; Sw 37 Av & Florida Av; Us 1 & Sw 37 Av N/n; Douglas Rd Station @ 3100 Sw 37 Av; Coconut Grove.

Bus: 37, 40, 42, MIACOCO, CGABGA, 136, 400, CGABLE.Train: GREEN, ORANGE.

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Critical Path Construction easily from the Moovit App or Website.

We make riding to Critical Path Construction easy, which is why over 1.7 billion users, including users in Miami, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of bus and train, costs and ride fares to Critical Path Construction, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Critical Path Construction Address: 3305 SW 37th Ave street in Miami

Critical Path Construction, Miami

Get around Miami by public transit!

Traveling around Miami has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Miami.

When traveling to any destination around Miami use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

Wondering how to use public transit in Miami or how to pay for public transit in Miami? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Miami public transit lines? Moovit public transit app shows all public transit maps in Miami with all Bus, Train, Light Rail and Ferry routes and stops on an interactive map.

Miami has 4 transit type(s), including: Bus, Train, Light Rail and Ferry, operated by several transit agencies, including Broward County Transit, Miami-Dade Transit, Metrorail, Palm Tran, Tri-Rail, Brightline, MARTY, City of Homestead Trolley, Key West Transit, Treasure Coast Connector, GoLine IRT, Amtrak, Greyhound-us, FlixBus-us and Aventura Express Shuttle Bus

Public transit lines with stations closest to Critical Path Construction in Miami

Train lines with stations closest to Critical Path Construction in Miami

Bus lines with stations closest to Critical Path Construction in Miami